Skip to main content
← Services Index SHEET 01 / 01 · REV 2024
§ 01 / Services Catalog

Construction
Quality
Enhancement.

Systematic QA/QC for builders, developers and RMC operators. Quality plans, work procedures, audits and on-site training — mapped to IS, ASTM and BIS codes, written for your site, not a template.

SCOPE

Full QA/QC

Plans · Procedures · Audit · Training

DURATION

4–12 weeks

Modular, scoped to project size

DELIVERABLES

20+ docs

Manuals · Checklists · Method statements

150 MM · CUBE SPEC M40 QA · QC SPEC.001 · REV.A

FIG. 01 — Standard Concrete Test Cube · IS 516

24+
Years · Founder QA/QC Experience
25
Active Client Relationships
515
Plant Audit Checkpoints
28
Code-Referenced FAQ Topics
§ 01 / Scope of Work

What this engagement covers.

The Construction Quality Enhancement engagement is a closed-loop QA/QC implementation — not a documentation handover. We instrument your site, train your team, audit your results and stay until the final cube is crushed.

CLIENT
Builder · Developer · RMC Operator
SITES
Greenfield + Brownfield (live projects)
CODES
IS 456 · IS 516 · IS 383 · IS 9103 · ASTM C39
OUTPUT
Live Document Set + On-Site Audit Cycle
REPORTING
Weekly · Bi-weekly · Monthly — your call

Six Pillars of Work

A complete QA/QC stack — each pillar is a deliverable you receive and a checkpoint we measure.

  • 01 Quality Manual — project-grade QMS, ISO 9001-aligned
  • 02 Inspection & Test Plan — ITP with hold/witness/review points
  • 03 Work Method Statements — WMS for every critical activity
  • 04 Field Checklists — paper + mobile, ready-to-deploy
  • 05 Technical Audits — quarterly on-site reviews
  • 06 Capability Training — foreman, QC engineers, plant staff
§ 02 / Methodology

A five-stage engagement, not a one-shot.

Quality is not a deliverable you receive. It is a process your team runs. The five-stage model below is taken from the ConcreteInfo Capability Brief §12 — Diagnose → Design → Deploy → Embed → Sustain. Each stage produces visible artefacts and a defined go/no-go decision before the next begins.

Plan–Do–Check–Act / डेमिंग चक्र — the continuous improvement cycle that anchors every ConcreteInfo engagement. Each quadrant lists the artefacts produced and the decision gate before the next phase begins.
01
STAGE · DIAGNOSE

Site & System Audit

Walkthrough of active sites and the QC documentation on file. We measure what is in place against IS / BIS requirements and capture the gaps in a scored report. Output: baseline diagnostic with prioritised issues and risk rating.

DURATION · 2–5 DAYS
02
STAGE · DESIGN

Plan & Procedure Draft

We author the Quality Manual, ITPs, method statements and checklists tailored to your project — not a generic template. All documents are reviewed with your QC team before sign-off.

DURATION · 2–3 WEEKS
03
STAGE · DEPLOY

Train & Implement

On-site capability training for QC engineers and foremen. Mobile checklists deployed, plant trials if RMC is involved. We do not leave until the team is running the system on its own.

DURATION · 2–4 WEEKS
04
STAGE · EMBED

Capability Transfer

Coaching your supervisors and QC engineers through real inspections, NCR closure, and cube-failure investigations. The system becomes theirs, not ours — measured by reduced reliance on external sign-off.

DURATION · 4–8 WEEKS
05
STAGE · SUSTAIN

Quarterly Reviews

Recurring technical audits of the running system. We trend cube results, NCR closure time and audit non-conformances — surfacing what actually works versus what only looks good on paper.

CADENCE · QUARTERLY
§ 03 / Deliverables

What you receive on day one.

Every artefact listed below is produced during the engagement and handed off in editable source format. Codes match the internal document control you already use.

DOC · QM · 001

Project Quality Manual

Project-scoped QMS with policy, scope, document control and audit cycle.

DOC · ITP · 002

Inspection & Test Plan

Activity-wise ITP covering all trades — hold / witness / review points defined.

DOC · WMS · 003

Work Method Statements

Step-by-step procedures for concreting, RCC, post-tensioning, repairs & rehab.

DOC · CHK · 004

Field Checklists

Printable and mobile-ready checklists for shuttering, rebar, pour and cube.

DOC · NCR · 005

NCR / CAR Templates

Non-conformance and corrective action forms aligned with closure workflow.

DOC · TRN · 006

Training Material Set

Slide decks, handouts, and quiz bank for QC engineer and foreman level.

DOC · MIX · 007

Concrete Mix Designs

IS 10262-based mix designs for all grades in use, with trial results.

DOC · AUD · 008

Audit Checklists

Site, plant and lab audit instruments — 515 checkpoints for RMC plants.

DOC · KPI · 009

KPI Dashboard Spec

Definitions, formulas and sources for cube strength, NCR closure, etc.

§ 04 / Why ConcreteInfo

Engineers who audit, then write the documents.

Most QA/QC consultancies hand you a folder of templates and leave. We stay through the first pour, the first NCR, and the first audit cycle. The reason: that is where the system actually works or fails.

01

Founder-led audits

Every audit is conducted — not delegated — by an engineer with two decades on Indian RMC plants and live sites. Not a junior with a clipboard and a tick-box template.

02

Honest, falsifiable recommendations

Our founder's signature position is that quality advice must be defensible — never what the client wants to hear. If your system is broken, we tell you. If it is fine, we tell you that too.

03

Real plant experience

The 515-checkpoint RMC audit used in our software was built on years of actual plant work — not slides. We know which non-conformances actually matter.

§ 05 / Frequently Asked

Pre-engagement questions, answered.

Q.01

Do you take one-project engagements or only retainer contracts?

Both. For a single RMC plant audit or a one-off quality manual, we run a defined-scope project. For ongoing QA/QC at a residential project or commercial site, retainer engagements are more cost-effective — talk to us about a quarterly cycle.
Q.02

Will you adapt to our existing templates or replace everything?

We work with what you have. If your existing format is sound, we adopt it; we rarely replace for the sake of replacing. Our default is to start with your last ITP and add the missing checkpoints, then upgrade the surrounding procedure doc.
Q.03

How do you handle confidential client work and reports?

Audit findings are shared only with the named client POC and are not republished without written consent. We can route raw data to a client-only SharePoint, or push structured findings directly into your paperless workflow if you already run one.
Q.04

Can your deliverables integrate with our existing software dashboards?

Yes. We have built QA/QC dashboards for two of our existing clients and run a public-facing mix-design calculator that sees real traffic. Where it makes sense, we extend your existing system rather than introducing a parallel one.
§ END OF DOCUMENT · SVC / 01

Ready to put QA/QC
on the drawing board?

Send us a project brief — scope, current system, biggest pain point. We respond within 24 hours with a tailored proposal.

Phone: +91-9930954848 · Email: services@concreteinfo.in