Project Quality Manual
Project-scoped QMS with policy, scope, document control and audit cycle.
Systematic QA/QC for builders, developers and RMC operators. Quality plans, work procedures, audits and on-site training — mapped to IS, ASTM and BIS codes, written for your site, not a template.
Full QA/QC
Plans · Procedures · Audit · Training
4–12 weeks
Modular, scoped to project size
20+ docs
Manuals · Checklists · Method statements
FIG. 01 — Standard Concrete Test Cube · IS 516
The Construction Quality Enhancement engagement is a closed-loop QA/QC implementation — not a documentation handover. We instrument your site, train your team, audit your results and stay until the final cube is crushed.
A complete QA/QC stack — each pillar is a deliverable you receive and a checkpoint we measure.
Quality is not a deliverable you receive. It is a process your team runs. The five-stage model below is taken from the ConcreteInfo Capability Brief §12 — Diagnose → Design → Deploy → Embed → Sustain. Each stage produces visible artefacts and a defined go/no-go decision before the next begins.
Walkthrough of active sites and the QC documentation on file. We measure what is in place against IS / BIS requirements and capture the gaps in a scored report. Output: baseline diagnostic with prioritised issues and risk rating.
We author the Quality Manual, ITPs, method statements and checklists tailored to your project — not a generic template. All documents are reviewed with your QC team before sign-off.
On-site capability training for QC engineers and foremen. Mobile checklists deployed, plant trials if RMC is involved. We do not leave until the team is running the system on its own.
Coaching your supervisors and QC engineers through real inspections, NCR closure, and cube-failure investigations. The system becomes theirs, not ours — measured by reduced reliance on external sign-off.
Recurring technical audits of the running system. We trend cube results, NCR closure time and audit non-conformances — surfacing what actually works versus what only looks good on paper.
Every artefact listed below is produced during the engagement and handed off in editable source format. Codes match the internal document control you already use.
Project-scoped QMS with policy, scope, document control and audit cycle.
Activity-wise ITP covering all trades — hold / witness / review points defined.
Step-by-step procedures for concreting, RCC, post-tensioning, repairs & rehab.
Printable and mobile-ready checklists for shuttering, rebar, pour and cube.
Non-conformance and corrective action forms aligned with closure workflow.
Slide decks, handouts, and quiz bank for QC engineer and foreman level.
IS 10262-based mix designs for all grades in use, with trial results.
Site, plant and lab audit instruments — 515 checkpoints for RMC plants.
Definitions, formulas and sources for cube strength, NCR closure, etc.
Most QA/QC consultancies hand you a folder of templates and leave. We stay through the first pour, the first NCR, and the first audit cycle. The reason: that is where the system actually works or fails.
Every audit is conducted — not delegated — by an engineer with two decades on Indian RMC plants and live sites. Not a junior with a clipboard and a tick-box template.
Our founder's signature position is that quality advice must be defensible — never what the client wants to hear. If your system is broken, we tell you. If it is fine, we tell you that too.
The 515-checkpoint RMC audit used in our software was built on years of actual plant work — not slides. We know which non-conformances actually matter.
Send us a project brief — scope, current system, biggest pain point. We respond within 24 hours with a tailored proposal.
Phone: +91-9930954848 · Email: services@concreteinfo.in